The equipment schedule identifies the model, opening, stacking direction, quantity and price in US dollars. Read it with the listed profile and load limits before recording an order. The opening tool highlights measured conflicts; it does not certify the total extended length permitted by a motor.

CM components are intended for the CM profile. The CB battery profile differs. A standalone component may serve an existing installation, but selecting a spare does not establish that the existing track is compatible. Confirm that relationship before use.

The reference records the submitted information, not an installation certificate, a settlement notice or a dispatch confirmation. Questions or correction requests should quote the reference to support@curtainmotion.shop. Any rights that cannot legally be excluded continue to apply.

DRAWING DESK

Keep a local
opening note?

Remember span, return and curtain weight on this device

PROJECT NOTES

A considered start.
A10% welcome.

Join product and project notes to apply a10% equipment saving in this session.